
Project
Drilling, installation of Dywidag bars, and injection as a support system for the tugboat dock in Paraíso.
Client: Panama Canal Authority
Construction year: 2023
Description
The project involved drilling, placement of Dywidag bars, and injection as support for the tugboat dock in Paraíso. A total of 11 drills were carried out, with an approximate total of 300 linear meters of 193 mm diameter at a 30-degree angle.