Contact Us

(+507) 208-8818 / 392-8840

Write to Us

activfondpanama@gmail.com

Project

Drilling, installation of Dywidag bars, and injection as a support system for the tugboat dock in Paraíso.

Client: Panama Canal Authority

Construction year: 2023

Description

The project involved drilling, placement of Dywidag bars, and injection as support for the tugboat dock in Paraíso. A total of 11 drills were carried out, with an approximate total of 300 linear meters of 193 mm diameter at a 30-degree angle.

WhatsApp