
Project
Installation of Ø225 mm Micropiles with Ø114.3 mm Pipe Reinforcement
Client: HPH Consortium - Line 3 of the Panama Metro
Construction year: 2024
Description
Execution of 225 mm diameter micropiles, using 114.3 mm diameter and 9 mm thick steel tube reinforcements, ensuring high structural strength and stability for the project.